|
|
|
|
|
Edinboro University - Butterfield Hall |
|
|
|
|
EDINBORO UNIVERSITY |
|
MCNERNEY HALL
EDINBORO, PA 16444 |
|
|
|
MR. APPI ALLA, DIRECTOR
CAMPUS DESIGN AND CONSTRUCTION
814-732-2566 |
|
|
|
BID: MAY 14TH, 2012
TO BE COMPLETED: JUNE 30TH, 2013 |
|
|
|
COST: $2,700,000
|
|
|
|
8,700 SQ. FT. ADDITION
9,331 SQ. FT. ALTERATION
|
|
|
|
|
|
|
|
Client since 2008 |
|
|
|
|
MORE INFO: |
We completed a study process to determine which of two buildings should be modified to provide a lecture hall for the School of Education. The University approved the following scope of work at Butterfield:
- New addition for a 92 seat lecture hall
- New Dean's Suite of offices; entry from the exterior with focal point; student lounge/entry corridor; offices for Accreditation and student teachers; technology area; conference room; and storage.
- Evaluation of existing boiler plant and chiller to determine capacity to serve the new addition.
- Renovation of spaces for a new Math/Science area, new Computer Lab, new Integrated Arts area, enlarged Student Lounge.
|
|
PROFILES AND OTHER PDFS: |
|
|
|